To create a Bill of Materials for the example drawing shown in Step 7, choose Management + BIM > Production > BOM . In the BOM dialogue window, specify the desired output options. Click the OKbutton to start the BOM generation.
Structure list in the Report Manager
Step 7: Change Released Drawings
For the creation/ management of the production data please also see Example 3.
Requirements for a Smooth Operation (ManBIM) • Pre-planning of the Construction Process (ManBIM) • Overview of functions (ManBIM)
© Copyright 1994-2018, ISD Software und Systeme GmbH |