Parts / Drawings |
|
Without drawing |
No production drawing exists for the part. |
Drawing up to date |
A production drawing exists for the part. The production drawing is up to date. |
Drawing not up to date |
A production drawing exists, but it is not up to date. |
No drawing required |
or
|
Drawing checkup |
The production drawing has the Workflow status Checkup. The permissions to change or delete the parts or drawings will be withdrawn until the checkup status will be reset. |
Drawing released |
The production drawing has the Workflow status Released. After Release the permissions to change or delete the parts or drawings will be withdrawn, i.e. the parts in the model drawing can no longer be changed. |
Mounting drw. up to date |
The mounting drawing is up to date. |
Mounting drw. not up to date |
The mounting drawing is not up to date. |
Mounting drw. checkup |
The mounting drawing has the Workflow status Checkup. The permissions to change or delete the parts or drawings will be withdrawn until the checkup status will be reset. |
Mounting drw. released |
The mounting drawing has the Workflow status Released. After Release the permissions to change or delete the parts or drawings will be withdrawn, i.e. the parts in the model drawing can no longer be changed. |
Mounting drawing part |
Part of a mounting drawing. |
Customer drw up to date |
The customer drawing is up to date. |
Customer drw not up to date |
The mounting drawing is not up to date. |
Customer drw checkup |
The customer drawing has the Workflow status Checkup. |
Customer drw released |
The customer drawing has the Workflow status Released. In contrast to the release of production and mounting drawings the release of customer drawings does not lead to a locking of the corresponding parts in the model drawing. This means that if the parts of the customer drawing are not part of a released production drawing and mounting drawing, these parts will not be locked in the model drawing. |
Customer drawing part |
Part of a customer drawing. |
Itemized |
The part has an item number. |
Deleted |
When you delete objects in a model drawing that is managed via the Management+BIM module, they will be removed from the drawing. When you then save the drawing, the corresponding data records of the deleted objects will be assigned the link type "Deleted". To remove the die associated drawing, select it and confirm with OK when updating the drawings. |
External part data |
|
Without DSTV-NC data |
Depending on the settings in the Configuration Editor and after executing the functions in the Production function group, these links will be assigned to beams and plates in the model drawing. For the NCW output two same-named files (*.NCW and *.DXF) will be created. These files have the same document number and are linked to each other via the "NCF-DXF data" link. To be able to distinguish the documents they are assigned the Sheet number 1 (NCW) and 2 (DXF), respectively. When the attribute Document type is added in the the HELiOS result list the different will become apparent. Result list with document type
|
Without DXF data |
|
Without STEP data |
|
Without NCW data |
|
DSTV-NC data up to date |
|
DSTV-NC data not up to date |
|
DXF data up to date |
|
DXF data not up to date |
|
STEP data up to date |
|
STEP data not up to date |
|
NCW data up to date |
|
NCW data not up to date |
|
NCW-DXF data |
|
External drawing data |
|
DXF drawing up to date |
In contrast to the documents for the individual beams and plates, the PDF, DXF and DWG files for production drawings can be automatically created - either upon checkup, or upon release, or upon creating and updating of the drawing. |
DXF drawing not up to date |
|
PDF data up to date |
|
PDF data not up to date |
|
DWG drawing up to date |
|
DWG drawing not up to date |
|
Pre-planning of the Construction Process (ManBIM) • Important information (ManBIM) • Overview of functions (ManBIM)
© Copyright 1994-2018, ISD Software und Systeme GmbH |