Drawing Management Status in the ICN

CAD drawings that have been created and processed with Steel Engineering Drawing Management are identified in the ICN as follows:

 

Furthermore, parts are marked with the following icons:

The part belongs to a "Released" drawing, but other workflows exist. (This requires an adjusted workflow. Please contact our Consulting for this).

The indication of the workflow status will be automatically updated after changes. To speed up the build-up of the ICN in case of a slower interface to HELiOS or very large drawings, the conditions for these updates can be set in the Configuration Editor at PDM > Management + BIM > Update Workflow status.

Possible settings are:

The ISD default setting is Always.

Requirements for a Smooth Operation (ManBIM)Pre-planning of the Construction Process (ManBIM)Overview of functions (ManBIM)