Change Route - Move Connecting Parts

Plant Engineering > Pipeline Tools > Change > Change route 

If connecting guidelines are created it makes sense to move parts like seals or flanges to the end of the newly created guideline. This behaviour can be switched on in the dialogue window , by activating the Create connecting guidelines and the Move connecting parts checkboxes.

Change route by creation of connecting guideline (left) and moving of connecting parts

Pipeline Tools (PE)Plant Engineering Functions