Project: Drawing Management

Drawing Management Status in the ICN

CAD drawings that have been created and processed with Drawing Management are identified in the ICN as follows:

 

Furthermore, parts are marked with the following icons:

The part belongs to a "Released" drawing, but other workflows exist. (This requires an adjusted workflow. Please contact our Consulting for this).

The indication of the workflow status will be automatically updated after changes. To speed up the build-up of the ICN in case of a slower interface to HELiOS or very large drawings, the conditions for these updates can be set in the Configuration Editor at PDM > Drawing Management > Update Workflow status.

Possible settings are:

The ISD default setting is Always.

Requirements for a Smooth Operation (DrwMan)Pre-planning of the Construction Process (DrwMan)Overview of functions (DrwMan)

© Copyright 1994-2021, ISD Software und Systeme GmbH
Version 2601 - Drawing Management
Date: 20/10/2021     Language: 1033

> Feedback on this topic

Data protectionTerms and ConditionsCookiesContactLegal notes and Disclaimer