Project: HiCAD Plant Engineering
Plant Engineering > Settings
Use the functions of the Settings function group to specify various basic settings for the working with Plant Engineering functions.
| 
                         
                              | 
                    
                         Plant Engineering Settings (General) Enables you to specify important settings for part insertion, part selection, P+ID symbol assignment, links to P+IDs, the actions during loading/saving, and Bills of Materials (BOMs). Clicking  
  | 
                ||||||||||||||||||||||
| 
                         
                              | 
                    
                        
                         Pre-sets the selection order during part insertion.  | 
                ||||||||||||||||||||||
| 
                         
                              | 
                    
                        
                         Manual setting of a Plant Engineering ID for a construction.  | 
                ||||||||||||||||||||||
                         
                     | 
                    
                        
                         Activation of a pipeline via identification, i.e. selection with cursor. Clicking  
  | 
                
            
        
Plant Engineering Functions • Pre-Settings in System Files (PE)
| 
                             
								© Copyright 1994-2019, ISD Software und Systeme GmbH  |