Project: HiCAD Element installation
The changed catalogue entries must now be applied to the model drawing. To ensure that the changed catalogue parts will be used and no old data will be used, the following two steps will be required for the element installation and the sub-structure:
The bore has now appeared in one of the intersection points of the c-edged that we defined in the Connection parameters dialogue window. As only one bore had been planned for the asbestos cement panel, no bore was applied in the second intersection point. However, this can be done easily at any time.
Next step: Plan a second bore for the asbestos cement panel
© Copyright 1994-2020, ISD Software und Systeme GmbH |
Data protection • Terms and Conditions • Cookies • Contact • Legal notes and Disclaimer