Project: HiCAD Dach/Wand/Fassade

Example: Create Parts with Connection Parameters - Step 7

Step 7: Plan second bore for asbestos cement panel

Now, bores will be automatically placed into the two intersection points. However, these are now located centrally on the T-beam. A more aesthetic solution would involve a minimal lateral displacement, and maybe a placing of 2 bores per intersection point to allow a fixing of the plate slightly to the side of the centre.

 

Next step: Plan staggered bores

Connection Parameters

© Copyright 1994-2019, ISD Software und Systeme GmbH
Version 2402 - HiCAD Dach/Wand/Fassade
Date: 14/10/2019

> Feedback on this topic