Project: HiCAD Plant Engineering

Settings

Plant Engineering > Settings

Use the functions of the Settings function group to specify various basic settings for the working with Plant Engineering functions.

Plant Engineering Settings (General)

Enables you to specify important settings for part insertion, part selection, P+ID symbol assignment, links to P+IDs, the actions during loading/saving, and Bills of Materials (BOMs).

Clicking opens a pull-down menu with further functions:

Pre-selection

Pre-sets the selection order during part insertion.

Identify as Plant Engineering

Manual setting of a Plant Engineering ID for a construction.

Activate pipeline

Activation of a pipeline via identification, i.e. selection with cursor.

Clicking opens a pull-down menu with further functions:

 

Activate pipeline, via list

Activation of a pipeline via selection from a pipeline list.

Plant Engineering FunctionsPre-Settings in System Files (PE)

© Copyright 1994-2019, ISD Software und Systeme GmbH
Version 2402 - HiCAD Plant Engineering
Date: 06/10/2019

> Feedback on this topic